Activity
From 03/06/2013 to 03/15/2013
03/14/2013
- 11:43 PM Revision 0f4a14b5: Did a final review and then created gerber files for fabrication.
- 02:14 AM Revision 53bd6ff8: Good thing I did a final design check... it turns out that I had my pads misnumbered for both ICs. It took me a couple of hours to fix it but I think it's okay now.
03/13/2013
- 12:50 AM Revision 40122ec2: Finalized BOM.
03/12/2013
- 10:15 PM Revision 1e26331d: Merge branch 'master' of 71.178.202.220:/home/dsorber/trac/projects/headquarters/repo
- 10:15 PM Revision dbe3eff8: Updated the BOM while in "class" last night.
- 01:54 PM Revision 72edc545: Made the reference designators a bit smaller and made some square pads to designate pin 1's.
- 11:33 AM Revision 8a86f755: Made a few more minor tweaks to the layout. I also moved the LED labels to the silkscreen layer (whoops).
03/11/2013
- 08:33 PM Revision bf56c619: Made a few tweaks to the layout including adding a board name and revision to the silk screen.
- 12:37 PM Revision 8b7ff847: Made a couple of modifications based on Andy's feedback.
03/10/2013
- 08:04 PM Revision dc972317: Finished routing the board! Tomorrow Andy will tell me I did it all wrong...
03/09/2013
- 05:28 PM Revision dd4d4844: Prerouting failsafe commit.
- 04:02 AM Revision 2607c262: Made a few more corrections to the schematic and then started working on the actual PCB layout. The PCB will be approximately 2 inches by 3 inches.
03/08/2013
- 02:50 AM Revision a993b699: Forgot to create PDF of lastest schematic.
- 02:46 AM Revision 1f08bcbd: Finished up schematic and started working on PCB. Then had to go back and fix schematic :( . Finally ran out of steam...